October 24, 2026 Admin

Last updated: October 24, 2026Quick answer: most ADU permits are delayed by zoning and review comments, not by the drawings themselves. A simple conversion can sometimes move faster, while a detached build often takes longer because it adds new site and utility checks. If you want an approval path with fewer surprises, ADU permitting, approvals, and inspections need to be lined up in order from the start. An ADU usually gets delayed in permitting, not in design. If you want a garage conversion, backyard cottage, or basement apartment approved without months of avoidable back-and-forth, the real job is to line…

October 24, 2026 Admin

Last updated: October 24, 2026On this pageKey TakeawaysWhat the ADU permit application needs in the submission packetHow do you prepare an ADU permit application?Which drawings belong in the plan set?What should the site plan and survey show?What forms, signatures, and approvals must be included?Which technical documents do reviewers expect beyond drawings?What gets omitted most often, and what does it cost the application?Key Takeaways The ADU permit application needs a full document package, not just drawings. The plan set should cover the minimum sheets needed to explain the ADU from street to foundation. The site plan and survey should place the…